Furnace Laboratory

Infrastructure: physical space of 20 m², with the following equipment: EDG F 1800 high-temperature furnace (up to 1800° C), six EDG F 1800 furnaces (up to 1200° C), two EDG F 3000 furnaces (up to 1200° C), two vertical tube furnaces (up to 1200° C), Flyever FE 50 R controller, Microtube Fe50 RP glass melting furnace.